Route Planning
Plan the most efficient routes for single or multiple stops in seconds. Upper analyzes distances, traffic patterns, and delivery priorities to create optimized routes that save time and reduce fuel costs.

Driver Management
Organize your entire driver fleet effortlessly. Assign routes based on availability, track performance metrics, and manage driver workloads to ensure balanced distribution and maximum productivity.

Customer Notifications
Keep customers informed automatically. Send real-time delivery updates, estimated arrival times, and completion confirmations via SMS or email, reducing support calls and improving satisfaction.

Import Spreadsheet
Upload hundreds of addresses instantly from Excel or CSV files. Upper automatically validates addresses, detects duplicates, and organizes your stops, turning hours of manual entry into minutes.

Capacity Optimization
Maximize vehicle utilization without overloading. Upper considers package dimensions, weight limits, and delivery constraints to distribute stops efficiently across your fleet’s capacity.

Fleet Management Software
Track and manage your entire fleet in one place. Monitor vehicles, drivers, maintenance, fuel, and compliance through a single platform, giving you real-time visibility and control over daily operations.

Route Scheduling
Schedule routes days or weeks in advance with confidence. Assign specific time windows, set recurring deliveries, and manage your entire fleet’s schedule from one centralized dashboard.

GPS Tracking
Monitor your drivers in real-time with live GPS tracking. See exactly where each vehicle is, track progress throughout the day, and respond quickly to delays or route changes as they happen.

Smart Analytics
Transform delivery data into actionable insights. Track key metrics like on-time performance, fuel efficiency, and route productivity to identify improvements and make smarter operational decisions.

Proof of Delivery
Capture delivery confirmation on the spot. Drivers can collect signatures, take photos, and add notes directly in the app, creating a complete digital record for every completed delivery.

Barcode Scanner
Eliminate manual errors with barcode scanning. Drivers can scan packages for pickup and delivery verification, ensuring accuracy and creating an automated audit trail for every shipment.

Trusted by Teams Delivering Every Day
Plan Fast. Adapt Faster.
Try Upper free for 7 days—no credit card require.